Technical Analysis for WDO - Wesdome Gold Mines Ltd.
ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Weak or Absent | Up | Down | Up |
Date | Alert Name | Type | % Chg |
---|---|---|---|
180 Bearish Setup | Bearish Swing Setup | 6.32% | |
Slingshot Bearish | Bearish Swing Setup | 6.32% | |
Stochastic Buy Signal | Bullish | 6.32% | |
Calm After Storm | Range Contraction | 6.32% | |
Oversold Stochastic | Weakness | 6.32% | |
Calm After Storm | Range Contraction | 5.18% | |
NR7 | Range Contraction | 5.18% | |
Lower Bollinger Band Walk | Weakness | 5.18% | |
Gapped Down | Weakness | 5.18% | |
Lower Bollinger Band Touch | Weakness | 5.18% |
Alert | Time |
---|---|
Rose Above 10 DMA | about 3 hours ago |
Up 1 ATR | about 3 hours ago |
Rose Above 200 DMA | about 3 hours ago |
Up 5% | about 3 hours ago |
200 DMA Resistance | about 3 hours ago |
Get this analysis on your stocks daily!
- Earnings date: 2024-08-14
Wesdome Gold Mines Ltd. Description
Wesdome Gold Mines Ltd. is engaged in gold mining operations. The Company is producing gold at the Eagle River Complex and open pit Mishi gold mines. Its Eagle River Complex is located in Central Ontario, which includes the Eagle River Mine, the Mishi Mine and shared infrastructure, including the mineral processing plant. It also owns exploration assets and infrastructure in Val d'Or, Quebec (the Quebec Wesdome Properties) and the Moss Lake Property located near Thunder Bay, Ontario. Its mineral properties include over 11,010 hectares of staked claims, patented claims and mining leases. The Mishi property is located approximately 10 kilometers to the north in the Mishibishu Lake area. The Eagle River Mine is located approximately 50 kilometers due west of Wawa, Ontario, and over 60 kilometers southeast of Hemlo. It holds interest in Moss Lake property, which is located in the Shebandowan Greenstone Belt, approximately 100 kilometers due west of Thunder Bay, Ontario.
Classification
Sector: Basic Materials
Industry: Gold
Keywords: Mining Mineral Gold Mineral Properties Mines Stone Infrastructure Dow Gold Mining Greenstone Belt Abitibi Gold Belt Gold Mines The Eagle Wawa Mineral Processing Shebandowan The Moss Wesdome Gold Mines
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 14.99 |
52 Week Low | 7.03 |
Average Volume | 530,967 |
200-Day Moving Average | 11.512 |
50-Day Moving Average | 12.575 |
20-Day Moving Average | 12.237 |
10-Day Moving Average | 11.711 |
Average True Range | 0.516 |
RSI (14) | 33.33 |
ADX | 19.15 |
+DI | 15.077 |
-DI | 26.993 |
Chandelier Exit (Long, 3 ATRs) | 12.291 |
Chandelier Exit (Short, 3 ATRs) | 12.439 |
Upper Bollinger Bands | 13.634 |
Lower Bollinger Band | 10.839 |
Percent B (%b) | 0.09 |
BandWidth | 22.840 |
MACD Line | -0.396 |
MACD Signal Line | -0.267 |
MACD Histogram | -0.1292 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 11.680 | ||||
Resistance 3 (R3) | 11.720 | 11.560 | 11.580 | ||
Resistance 2 (R2) | 11.560 | 11.407 | 11.540 | 11.547 | |
Resistance 1 (R1) | 11.320 | 11.313 | 11.240 | 11.280 | 11.513 |
Pivot Point | 11.160 | 11.160 | 11.120 | 11.140 | 11.160 |
Support 1 (S1) | 10.920 | 11.007 | 10.840 | 10.880 | 10.647 |
Support 2 (S2) | 10.760 | 10.913 | 10.740 | 10.613 | |
Support 3 (S3) | 10.520 | 10.760 | 10.580 | ||
Support 4 (S4) | 10.480 |