Technical Analysis for PTM - Platinum Group Metals Ltd.
ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Weak or Absent | Up | Up | Up |
Date | Alert Name | Type | % Chg |
---|---|---|---|
NR7 | Range Contraction | 0.84% | |
Narrow Range Bar | Range Contraction | 0.84% | |
Earnings Movers | Other | 0.84% | |
Inside Day | Range Contraction | 0.84% | |
Wide Bands | Range Expansion | 0.84% | |
Earnings Movers | Other | 1.69% | |
Inside Day | Range Contraction | 1.69% | |
Wide Bands | Range Expansion | 1.69% | |
20 DMA Resistance | Bearish | -2.04% | |
MACD Bullish Centerline Cross | Bullish | -2.04% |
Alert | Time |
---|---|
Rose Above Previous Day's High | about 1 hour ago |
Outside Day | about 1 hour ago |
Up 1% | about 1 hour ago |
10 DMA Support | about 2 hours ago |
Fell Below Previous Day's Low | about 4 hours ago |
Free Daily (Stock) Chart Reading
- Earnings date: 2024-11-19
Platinum Group Metals Ltd. Description
Platinum Group Metals Ltd. is an exploration- and development-stage Company. The Company is focused on exploration and development of platinum. The Company conducts work on mineral properties it has staked or acquired by way of option agreements in the Republic of South Africa and in Canada. Its business is focused on production ramp up at the Maseve Mine, and the exploration and initial engineering on the Waterberg platinum deposit, which includes the Waterberg Joint Venture Project (the Waterberg JV Project) and the adjoining Waterberg Extension Project. The Company has operations in South Africa and Canada. The Maseve platinum mine site is located on the Western Limb of the Bushveld Complex approximately 35 kilometers north west of the town of Rustenburg. The Waterberg JV Project consists of a contiguous granted prospecting right area of approximately 255 square kilometers located on the Northern Limb of the Bushveld Complex, over 70 kilometers north of the town of Mokopane.
Classification
Sector: Basic Materials
Industry: Industrial Metals & Minerals
Keywords: Mineral Metal Mineral Properties Metals Water Engineering Platinum Prospecting Platinum Group Platinum Group Metal Mine Site Bushveld Bushveld Complex Geography Of South Africa Geology Of South Africa Grasslands
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 3.13 |
52 Week Low | 1.29 |
Average Volume | 40,296 |
200-Day Moving Average | 1.995 |
50-Day Moving Average | 2.210 |
20-Day Moving Average | 2.467 |
10-Day Moving Average | 2.303 |
Average True Range | 0.180 |
RSI (14) | 51.92 |
ADX | 19.36 |
+DI | 23.320 |
-DI | 16.802 |
Chandelier Exit (Long, 3 ATRs) | 2.590 |
Chandelier Exit (Short, 3 ATRs) | 2.610 |
Upper Bollinger Bands | 2.949 |
Lower Bollinger Band | 1.986 |
Percent B (%b) | 0.41 |
BandWidth | 39.035 |
MACD Line | 0.010 |
MACD Signal Line | 0.032 |
MACD Histogram | -0.0219 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 2.515 | ||||
Resistance 3 (R3) | 2.510 | 2.460 | 2.493 | ||
Resistance 2 (R2) | 2.460 | 2.426 | 2.463 | 2.485 | |
Resistance 1 (R1) | 2.420 | 2.404 | 2.440 | 2.425 | 2.477 |
Pivot Point | 2.370 | 2.370 | 2.380 | 2.373 | 2.370 |
Support 1 (S1) | 2.330 | 2.336 | 2.350 | 2.335 | 2.283 |
Support 2 (S2) | 2.280 | 2.314 | 2.283 | 2.275 | |
Support 3 (S3) | 2.240 | 2.280 | 2.268 | ||
Support 4 (S4) | 2.245 |