Mar 19 |
Arizona Sonoran Drilling at MainSpring Confirms Near Surface Mineralization
|
Mar 5 |
Arizona Sonoran Announces Acquisition of Land and Completes Rezoning MainSpring
|
Feb 29 |
BTV Highlights: Founders Metals, Arizona Sonoran, Prime Mining, enCore Energy & Reunion Gold
|
Feb 21 |
Arizona Sonoran Announces a Positive Pre-Feasibility Study for the Cactus Mine Project with a US$509M Post-Tax NPV and 55 kstpa Copper Cathode over 21 Years
|
Jan 30 |
Arizona Sonoran Announces 2024 Work Plan
|
Jan 25 |
Arizona Sonoran MainSpring Drilling Intersects Near Surface Mineralization; Intersects 1,053 ft (321 m) of 0.20% Total Copper from 147 ft (45 m) depth
|
Jan 16 |
Arizona Sonoran Drills 521 ft (159 m) @ 1.78%CuT at Parks/Salyer
|
Jan 10 |
Arizona Sonoran Extends Mineralization 674 ft (205 m) Below Cactus West Mineral Resource Shell; Drills 731 ft (223 m) of 0.92% CuT of Continuous Mineralization at Cactus East
|
Dec 14 |
Arizona Sonoran and Nuton LLC Announce Option to Joint Venture on Cactus Project in Arizona
|
Dec 13 |
Arizona Sonoran Reports Final Extraction Rates from Phase 1 of Nuton™ Technologies on the Cactus Sulphides and Expands the Program
|