Technical Analysis for BTO - B2Gold Corp.
Grade | Last Price | % Change | Price Change |
---|---|---|---|
C | 3.940 | 0.00% | 0.000 |
ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Weak or Absent | Flat | Up | Up |
Date | Alert Name | Type | % Chg |
---|---|---|---|
Shooting Star Candlestick | Bearish | 0.00% | |
Stochastic Sell Signal | Bearish | 0.00% | |
200 DMA Support | Bullish | 0.00% | |
Upper Bollinger Band Walk | Strength | 0.00% | |
Overbought Stochastic | Strength | 0.00% | |
Upper Bollinger Band Touch | Strength | 0.00% | |
Crossed Above 200 DMA | Bullish | 0.00% | |
Upper Bollinger Band Walk | Strength | 0.00% | |
Gapped Up | Strength | 0.00% | |
Overbought Stochastic | Strength | 0.00% |
Alert | Time |
---|---|
Upper Bollinger Band Resistance | about 8 hours ago |
200 DMA Resistance | about 8 hours ago |
Fell Below 200 DMA | about 8 hours ago |
Up 2% | about 10 hours ago |
Rose Above Previous Day's High | about 10 hours ago |
Get this analysis on your stocks daily!
- Earnings date: 2024-05-07
B2Gold Corp. Description
B2Gold Corp. (B2Gold) is a Canada-based gold producer with approximately four operating mines and one mine under construction. The Company has a portfolio of other evaluation and exploration projects in various countries, including Mali, Colombia, Burkina Faso, Finland, Chile and Nicaragua. Its material mineral properties consist of three mines and one mine under construction: Otjikoto mine, an open pit gold mine located approximately 300 kilometers north of Windhoek, the capital of Namibia (Otjikoto Mine); Masbate mine, an open pit gold mine, located near the northern tip of the island of Masbate, over 360 kilometers south-east of Manila (Masbate Gold Project); La Libertad mine, an open pit gold mine located over 110 kilometers due east of Managua and 32 kilometers northeast of Juigalpa, Nicaragua (La Libertad Mine), and Fekola gold project, an open pit gold mine under construction located approximately 40 kilometers south of the city of Kenieba, Mali (Fekola Project).
Classification
Sector: Basic Materials
Industry: Gold
Keywords: Mineral Gold Mineral Properties Mines Construction Namibia Nicaragua Gold Producer B2gold 2g
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 5.1046 |
52 Week Low | 3.18 |
Average Volume | 4,189,991 |
200-Day Moving Average | 3.927 |
50-Day Moving Average | 3.628 |
20-Day Moving Average | 3.641 |
10-Day Moving Average | 3.784 |
Average True Range | 0.117 |
RSI (14) | 65.40 |
ADX | 20.79 |
+DI | 37.184 |
-DI | 15.733 |
Chandelier Exit (Long, 3 ATRs) | 3.669 |
Chandelier Exit (Short, 3 ATRs) | 3.721 |
Upper Bollinger Bands | 3.990 |
Lower Bollinger Band | 3.291 |
Percent B (%b) | 0.93 |
BandWidth | 19.195 |
MACD Line | 0.078 |
MACD Signal Line | 0.037 |
MACD Histogram | 0.0414 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 4.105 | ||||
Resistance 3 (R3) | 4.113 | 4.067 | 4.078 | ||
Resistance 2 (R2) | 4.067 | 4.025 | 4.063 | 4.068 | |
Resistance 1 (R1) | 4.003 | 3.999 | 4.035 | 3.995 | 4.059 |
Pivot Point | 3.957 | 3.957 | 3.973 | 3.953 | 3.957 |
Support 1 (S1) | 3.893 | 3.915 | 3.925 | 3.885 | 3.821 |
Support 2 (S2) | 3.847 | 3.889 | 3.843 | 3.812 | |
Support 3 (S3) | 3.783 | 3.847 | 3.803 | ||
Support 4 (S4) | 3.775 |